The US 84 Drainage Improvement Project in Elba, Alabama’s historic Black Shiloh community was troubled from the start. Although the Alabama Department of Transportation (ALDOT) announced the project on January 8, 2026, no public information meeting was held before construction began, despite years of documented highway-related flooding that residents hoped the project would address.
Recent events have intensified community concerns about the project's effectiveness. A newly constructed detention basin retained stormwater for 54 consecutive days, ultimately requiring ALDOT to pump the water from the facility. On a separate occasion, stagnant water remained in the basin for 16 consecutive days. In addition, stormwater from the same basin has overflowed onto adjacent private property on three occasions, including the property occupied by Rosie's Kitchen, a Black-owned restaurant.
These incidents raise serious questions about whether the federally-funded project is meeting the objectives of federal highway drainage standards, NPDES stormwater requirements, and the October 4, 2024, FHWA-ALDOT Voluntary Resolution Agreement (VRA) that was established to resolve Title VI civil rights complaints related to flooding in the Shiloh community.
In summary, the Shiloh community has experienced fifteen flooding events since the US 84 expansion and three additional flooding events following construction of the new drainage improvement project. Residents have also documented stormwater remaining in a detention basin on three separate occasions, with standing water persisting for periods ranging from 16 to 54 days. Together, these outcomes indicate significant deficiencies in both the highway expansion project and the recently constructed drainage system.
Residents maintain that no flooding events were documented before the highway was elevated approximately 10 to 15 feet above surrounding properties. Under the VRA, ALDOT committed to implementing drainage improvements intended to mitigate highway flooding and address longstanding community concerns, with compliance monitored by the FHWA Alabama Division Office in Montgomery.
A drainage project that continues to produce prolonged standing water and repeated overflows onto private property cannot reasonably be considered a complete solution to the flooding problem, regardless of whether construction activities have been finished. Under federal stewardship and oversight responsibilities, FHWA must evaluate not only whether the project was built, but whether it functions as intended and fulfills the commitments contained in the VRA.
Federal guidance, including FHWA's Urban Drainage Design Manual (HEC-22) and drainage requirements established under 23 CFR Part 650, emphasizes the importance of controlling runoff, preventing damaging flooding, and maintaining proper hydraulic performance. Extended periods lasting from 16 to 54 days greatly exceed the drainage periods typically expected for dry detention facilities. Such conditions can create nuisance conditions, increase mosquito populations, and indicate potential deficiencies involving basin capacity, outlet structures, dewatering controls, maintenance, or overall design performance.
Industry standards generally anticipate stormwater detention facilities draining within approximately 48-72 hours following rainfall. When water remains stagnant for weeks and mechanical pumping becomes necessary, it is fair to ask whether the facility is functioning according to its design intent. Repeated off-site overflows warrant investigation.
FHWA retains oversight authority to ensure that federally funded transportation projects comply with applicable laws, regulations, agreements, and approved specifications. Because the Shiloh drainage project resulted from a Title VI Voluntary Resolution Agreement, FHWA's responsibility extends beyond verifying construction completion. The agency must also determine whether ALDOT has successfully addressed the flooding impacts that gave rise to the original civil rights complaint.
The three documented overflow incidents and the 16-day and 54-day stagnation events are measurable evidence that the project is not performing. Before determining that VRA obligations have been satisfied, FHWA should carefully evaluate hydraulic adequacy, maintenance practices, dewatering operations, stormwater compliance requirements, and whether additional engineering modifications are necessary to achieve the project's intended purpose.
After years of recurring flooding from US 84, Shiloh homeowners, property owners, and business owners deserve more than temporary fixes and makeshift solutions. The 4.5-mile 2017 US-84 widening project that runs through the Black Shiloh community is unique: it is the only stretch of the 247.4-mile US-84 highway in Alabama where residents have had to endure over eight years of flooding, damaged homes and businesses, textbook highway robbery and transportation racism.
The Shiloh residents deserve a drainage system that effectively protects their homes, properties, and livelihoods from highway-generated stormwater runoff. Continued flooding, prolonged standing water, and the associated increase in mosquitoes and other nuisance conditions following major rainfall events suggest that important questions remain about whether the current project is delivering the relief the community was promised.
The Bullard Center team, in collaboration with our allies, is preparing a comprehensive report on Shiloh for Congressman Shomari Figures (D-AL). The report will support a request for an investigation by the U.S. House Transportation and Infrastructure Committee, on which he serves.
Residents of the flood-damaged Shiloh community deserve a full accounting of the roles played by ALDOT and the FHWA Alabama Division Office in the prolonged and ineffective trial-and-error response to the drainage and flooding problems created by these infrastructure projects. They also have a right to know why lasting solutions have not been implemented and why affected homeowners have not received fair compensation for their property losses and damages.